R N T S O L A R

Loading

visit our location:
Office no. 3140, 3rd Floor, WTC, Gigamall, Islamabad, 46000
Opening Hours:
Mon-Fri 8am-8pm Sat 9am-8pm
Send us mail
info@example.com
Phone Number
051 8899403
Get A Quote

Pepsi Cola Facility, Sukkur

Project Details

Client

Pepsi Cola Facility

Location

Sukkur

Power (KWp)

1000

Type

On-Grid

Date

October, 2022

Project Summary

Installed in October 2022 at Pepsi Cola, Sukkur, this powerful 1000kW solar installation consists of 1835 Longi modules (545W) and 10 Sungrow inverters (100kW each). Comprehensive electrical consultancy and precise installation provided by RnT have enabled substantial energy savings, reliable operational efficiency, and considerable environmental benefits for the plant.

Overview & Challenge​

A solar photovoltaic system converts sunlight into electricity and can supply power year-round when sized correctly. The core components are PV panels, a mounting structure, batteries for storage, interconnecting cables, a charge controller to manage charging, and an inverter that delivers AC power for standard appliances. During the day, the panels generate electricity to run loads and charge the batteries; stored energy then keeps things running after sunset or during outages. With proper placement and design, a solar system reduces grid dependence and provides steady, clean power.