R N T S O L A R

Loading

visit our location:
Office no. 3140, 3rd Floor, WTC, Gigamall, Islamabad, 46000
Opening Hours:
Mon-Fri 8am-8pm Sat 9am-8pm
Send us mail
info@example.com
Phone Number
051 8899403
Get A Quote

Sitara Flour Mill, Taxila

Project Details

Client

Sitara Flour Mill

Location

Taxila

Power (KWp)

330

Type

On-Grid

Date

August, 2024

Project Summary

Commissioned in August 2024, the 330kW solar installation at Sitara Flour Mill includes 570 Longi panels (580W) and three Huawei inverters (115kW). This complete design and installation by RnT helps the facility substantially reduce electricity expenses, maintain uninterrupted operational efficiency, and achieve key sustainability objectives.

Overview & Challenge​

A solar photovoltaic system converts sunlight into electricity and can supply power year-round when sized correctly. The core components are PV panels, a mounting structure, batteries for storage, interconnecting cables, a charge controller to manage charging, and an inverter that delivers AC power for standard appliances. During the day, the panels generate electricity to run loads and charge the batteries; stored energy then keeps things running after sunset or during outages. With proper placement and design, a solar system reduces grid dependence and provides steady, clean power.