R N T S O L A R

Loading

visit our location:
Office no. 3140, 3rd Floor, WTC, Gigamall, Islamabad, 46000
Opening Hours:
Mon-Fri 8am-8pm Sat 9am-8pm
Send us mail
info@example.com
Phone Number
051 8899403
Get A Quote

Askari Cement, Hassan Abdal

Project Details

Client

Askari Cement

Location

Hassan Abdal

Power (KWp)

3000

Type

Off-Grid

Date

July, 2022

Project Summary

Commissioned in July 2022, the 3MW solar plant at Askari Cement, Hassanabdal includes 5505 Longi Solar modules (545W) paired with 15 Huawei inverters (200kW each). RnT delivered comprehensive electrical consultancy and installation, dramatically improving the facility’s energy independence, operational efficiency, and environmental footprint through reliable renewable power.

Overview & Challenge​

A solar photovoltaic system converts sunlight into electricity and can supply power year-round when sized correctly. The core components are PV panels, a mounting structure, batteries for storage, interconnecting cables, a charge controller to manage charging, and an inverter that delivers AC power for standard appliances. During the day, the panels generate electricity to run loads and charge the batteries; stored energy then keeps things running after sunset or during outages. With proper placement and design, a solar system reduces grid dependence and provides steady, clean power.